Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
Information Name: | Shaanxi satellite sports (FIG), Zhouzhi silicon pu Stadium, silicon pu Stadium |
Published: | 2015-04-28 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Silicon PU stadium silicon PU stadium with excellent foundation adaptability to construction sites in most various environmental conditions, without adding any auxiliary materials, direct beach on the construction of the base surface can be. Without the deployment of Jingyang silicon pu court, without stirring, optionally scraping 1-5mm thickness, reducing construction technical requirements, reduce construction costs and improve construction schedule, to ensure project quality silicon pu Bin County Stadium, it is the preferred material of construction of the future . Silicon PU stadium construction materials guide Third, the elastic layer construction: construction should be carefully checked before the elastic layer in order to confirm the basis of duly processed elastic layer construction. The elastic layer is one component material, simply adjust suitable construction with thinner consistency, with teeth or gum scraper scratch coating on the base surface, each scraping thickness can not exceed 2mm (to about 1 mm for the best, every scratch Tu thick, to be added 1 to 2% water Stir Scraping) silicon pu stadium, each time interval before scraping together dryness prevail (general (20 ℃) ??for about 10-12 hours, depending on the scene weather and temperature conditions may be) until the coating thickness blew new requirements. Note leveling effect when Scraping, if not leveling scraping teeth marks, need to pay more thinner consistency adjusted to ensure that the surface leveling. If the temperature is low (<10 ℃) and low humidity (<50%), the need to add 3% to 8% water and stir evenly coated scratch, so to dry time is shortened, the specific amount of water is subject to on-site weather. Construction should be avoided in the hot sun. After the elastic layer to dry, with the water surface flatness test method, the water level at the need for further repair. Surface accumulation of particulate debris mixed or trim at the mill level required to be reinforced layer construction. Shaanxi satellite sports (FIG), Zhouzhi silicon pu Stadium, silicon pu Stadium Shaanxi satellite sports facilities provided by the Company. Shaanxi satellite sports facilities Limited (www.sxwxty.com) (www.sxwxtu.com) adhere to the "people-oriented" business philosophy, with a professional staff, and strive to provide the best products and services to contribute to society, and are welcome new and old customers throughout the visit, sincere cooperation for a better future. Shaanxi satellite sports - your trusted friend, Company Address: North Road, Xi'an too red decoration materials market three rows 14, Contact: Liu Bin. |
Admin>>>
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility