Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
Information Name: | Silicon silicon pu pu stadium standard _ _ Shaanxi satellite sports stadium |
Published: | 2015-05-01 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Silicon PU stadium construction materials guide in the pickling process to circle the water position and make identification mark. No terms pickling venue silicon pu stadium floor, should be fully polished, the powder foundation and construction waste all polished off the surface to form a solid, clean grass. For there is still space after pickling powder or lower strength silicon pu stadium tender should also be fully polished. 4, primer: After basic primer dry enough points with special multi-channel roller to the basal plane, the principle of the base surface after brushing up on a luminous film silicon pu stadium pictures, Deficiencies must be applied to make up enough so far, should be avoided high temperature under the hot sun or base case (> 45 ℃) construction to ensure the permeability of bottom paint (no fog rainy weather in the morning or in the evening is more appropriate). Silicon PU stadium construction materials guide Third, the elastic layer construction: construction should be carefully checked before the elastic layer in order to confirm the basis of duly processed elastic layer construction. The elastic layer is one component material, simply adjust suitable construction with thinner consistency, with teeth or gum scraper scratch coating on the base surface, each scraping thickness can not exceed 2mm (to about 1 mm for the best, every scratch Tu thick, to be added 1 to 2% water Stir Scraping), each time interval before scraping together dryness prevail (general (20 ℃) ??for about 10-12 hours, depending on weather and temperature field the case may be) until the coating thickness blew new requirements. Note leveling effect when Scraping, if not leveling scraping teeth marks, need to pay more thinner consistency adjusted to ensure that the surface leveling. If the temperature is low (<10 ℃) and low humidity (<50%), the need to add 3% to 8% water and stir evenly coated scratch, so to dry time is shortened, the specific amount of water is subject to on-site weather. Construction should be avoided in the hot sun. After the elastic layer to dry, with the water surface flatness test method, the water level at the need for further repair. Surface accumulation of particulate debris mixed or trim at the mill level required to be reinforced layer construction. Silicon silicon pu pu stadium standard _ _ Shaanxi satellite sports stadium provided satellite sports facilities Ltd. Shaanxi. Shaanxi satellite sports facilities Limited (www.sxwxty.com) (www.sxwxty.com) strong, credible, in Xi'an plastic flooring industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shaanxi satellite sports and you work into the brilliant, for a better future! |
Admin>>>
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility