Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
Information Name: | Silicon pu stadium floor | silicon pu Stadium | Shaanxi satellite sports |
Published: | 2015-05-02 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Silicon PU stadium construction materials guide Third, the elastic layer construction: construction should be carefully checked before the elastic layer in order to confirm the basis of duly processed elastic layer construction. The elastic layer is one component material, just use thinner consistency adjustment appropriate Hefei silicon pu stadium construction, with teeth or gum scraper Scraping the base surface, each scraping thickness can not exceed 2mm (to about 1 mm for the best When, every scratch thick, to be added 1 to 2% of water mixing evenly coated scratch), each time interval before scraping together dryness prevail (general (20 ℃) ??for about 10-12 hours, depending on the live weather and temperature conditions may be) until the coating thickness blew new requirements. Note leveling effect when Scraping, if not leveling scraping teeth marks, need to pay more thinner consistency adjusted to ensure that the surface leveling. If the temperature is low (<10 ℃) and low humidity (<50%), the need to add 3% to 8% water and stir evenly coated scratch, so to dry time is shortened, the specific amount of water is subject to on-site weather. Construction should be avoided in the hot sun. After the elastic layer to dry, with the water surface flatness test method, the water level at the need for further repair. Surface accumulation of particulate debris mixed or trim at the mill level required to be reinforced layer construction. Silicon PU stadium construction materials Guide 3, paint Construction Notes: A During the construction process, to deal with deployment of a good paint stirring periodically to ensure the consistency of the paint surface; B at unusually high temperatures, the need to add more depending on the circumstances C lower temperature, the higher the humidity, the longer the coating drying time;; D Do not ground temperature is below 10 ℃ or higher than 40 ℃ site construction; E requested on good weather during construction, and to determine the amount of water not rain within four hours after the completion of each coating application; F surface after completion of construction, maintenance 7 days be put into use; G Do not use any solvent and solubility product will fall on the product surface. H strengthening polished with sandpaper polishing machine on again after the completion of the finish layer of silicon pu stadium floor, the effect will be better. I reinforcing layer more than two days after the completion of the finish, it must be thoroughly polished to the surface of the oxide layer, or coat will delamination. J in the light of the weather under construction, not suitable for the construction of Ningxia cloudy silicon pu Stadium, will reduce adhesion. K after adding a crosslinking agent and slip sand stirring time to 2-3 minutes, stir up and down. Please run silicon pu court within one hour after L crosslinking agent is added over time can not be reused. M paste with the crosslinking agent ratio must be accurate, otherwise it can lead to topcoat delamination. N Store in a cool dry place, not exposure, the best storage temperature is 15 silicon pu stadium floor | silicon pu Stadium | Shaanxi satellite sports provided by sports facilities Ltd. Shaanxi satellite. Shaanxi satellite sports facilities Limited (www.sxwxty.com) (www.sxwxty.com) strong, credible, in Xi'an plastic flooring industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shaanxi satellite sports and you work into the brilliant, for a better future! |
Admin>>>
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility