Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
- home > Supply > Silicon material pu Stadium, Shaanxi satellite sports (certified), silicon pu Stadium
Information Name: | Silicon material pu Stadium, Shaanxi satellite sports (certified), silicon pu Stadium |
Published: | 2015-05-03 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Silicon PU stadium construction materials Guide 3, paint Construction Notes: A During the construction process, to deal with deployment of a good paint stirring periodically to ensure the consistency of the paint surface; B at unusually high temperatures, the need to add more depending on the circumstances C lower temperature, the higher the humidity, the longer the coating drying time;; D Do not ground temperature is below 10 ℃ or higher than 40 ℃ site construction; E requested on good weather during construction, and to determine the amount of water not rain within four hours after the completion of each coating application; F surface after completion of construction, maintenance 7 days be put into use; G Do not use any solvent and solubility product will fall on the product surface. H strengthen with sandpaper polishing machine polished finish again after the layer is complete, the results will be better. I reinforcing layer more than two days after the completion of the finish, it must be thoroughly polished to the surface of the oxide layer, or coat will delamination. J in the light of the weather under construction silicon pu Stadium, unfit cloudy construction, will reduce adhesion. K after adding a crosslinking agent and slip sand stirring time to 2-3 minutes, stir up and down. L crosslinking agent after an hour spent in the over time can not be reused. M paste with the crosslinking agent ratio must be accurate silicon pu Xiamen court, or can lead to topcoat delamination. Between N stored in a dry cool place, not exposure, optimum storage temperature for the standard size 15 plastic tennis court if it is two or more adjacent built two parallel silicon pu Xi'an tennis stadium, the venue of the adjacent edges distance not less than four meters. If the indoor tennis court Shanxi silicon pu, 6.40 meters beyond the end line above the clear height of not less than 6.40 m. Indoor tennis roof clear height over not less than 11.50 m. Outdoor tennis courts all around Weidang net height generally between 4-6 meters, depending on the surrounding environment and the building height Stadium, also may be appropriate to increase or decrease. Silicon material pu Stadium, Shaanxi satellite sports (certified), silicon pu Stadium Shaanxi satellite sports facilities provided by the Company. Shaanxi satellite sports facilities Limited (www.sxwxty.com) (www.sxwxty.com) is Xi'an, plastic floor leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer demand. Shaanxi satellite sports leadership with the staff warmly welcome all inquiries negotiations to create Shaanxi satellite sports a better future. |
Admin>>>
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility