Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
Information Name: | Silicon pu court budget _ Shaanxi satellite sports (certified) _ Silicon pu Stadium |
Published: | 2015-05-18 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Standard size standard plastic tennis courts [Tennis] size, the total area is 36.6 * 18.3 m, which effectively doubles the green field area doubles as singles field 23.77 * 10.97 m * 8.23 ??m to 23.77 ITF and the National Sports Commission promulgated The "tennis competition rules" in the provisions of a standard tennis court area of ??not less than 36.60 m (length) × 18.30 m (width), net of this size is a standard tennis net around the enclosure or interior architecture interior floor size. Within this area, effectively doubles the site's standard size is: 23.77 m (length) × 10.97 m (width), after each end of the line should be left empty room is not less than 6.40 m, at each edge should be left outside the room for free not less than 3.66 m. The posts in the stadium installation, measured at the center of two columns, column spacing is 12.80 meters, the top net post from the ground plane is 1.07 meters, from the ground along the center plane of the net is 0.914 m. Frierson silicon PU stadium construction materials guide VI Notes: 1, the material of the elastic layer is a one-component material, under normal temperature (≧ 20 ℃) ??do not need to add thinner, lower temperatures or when the need to increase the thickness of the silicon pu scratch court processes need to be added after adding 1-8% water and stir evenly coated scratch, so to dry time is shortened, the amount of water is subject to site specific weather and temperature may be. In this material system, the water is curing agent, at above 15 ℃ water can be added to 0.5-2%, at lower temperatures can be added 3-8%. 2. In case of rain before construction primer should be good rain days 2-3 days after exposure to silicon pu stadium construction, before the next step of construction. 3, the elastic layer construction generally should begin construction in the afternoon temperatures begin to fall, to prevent overheating and blistering. 4, must be weighed accurately and stir the deployment of materials. 5, the construction finish at lower temperatures should be after 8:00, 15:00 before construction to prevent freezing. Meanwhile, the surface layer material insulation measures should be taken to prevent freezing. Silicon pu court budget _ Shaanxi satellite sports (certified) _ Silicon pu Stadium Shaanxi satellite sports facilities provided by the Company. Shaanxi satellite sports facilities Limited (www.sxwxty.com) (www.sxwxty.com) is Xi'an, plastic floor leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer demand. Shaanxi satellite sports leadership with the staff warmly welcome all inquiries negotiations to create Shaanxi satellite sports a better future. |
Admin>>>
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility