Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
Information Name: | Baoji silicon pu stadium construction, silicon pu Stadium, Shaanxi satellite sports |
Published: | 2015-06-04 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Silicon PU stadium construction reinforcements: reinforcement layer (TB-003) for the one-component water-absorbing materials, rubber scraper with 1 to 2 minute scratch directly on good elastic trim levels must ensure that the smooth surface after scratch Baoji Silicon pu stadium construction, each time scraping together dryness prevail before the interval (usually about 10 hours, depending on weather conditions site) until scraping to a desired thickness. If the temperature is low (<12 ℃) and low relative humidity (<60%) silicon pu stadium, to be added 2-5% water and stir evenly coated scratch, in order to accelerate the curing material, reducing time between silicon pu stadium project cost, specific amount of water depending on the weather scene. If the temperature is low, increase the consistency of paint, you can add the right amount thinner consistency regulate construction. Construction should be avoided in the hot sun at high temperatures should be kept 2 to 3 hours from strong sunlight Weinan silicon pu stadium construction after construction, or because the surface of the molding surface too quickly can cause bubbling. If there is debris mixed or scratch unevenness of the need to be trimmed surface construction smoothed in the construction process. Silicon PU basketball court: three spraying points, first, two plus 30% (TB-205 weight) special sand, every TB-205 the amount of about 0.12kg, the third without sand (amount of about 0.06kg), when the sand should be first A component with a special sand mix well, then add component B Stir, add water dilution; three seconds of the area should be done three sand and a sand without (a total of four Road). B, tennis court: three spraying points, the first increase of 50% sand, the second with 20% sand, and the third channel without sand. C, badminton, volleyball: no sand spraying three. 4, marking Baoji silicon pu stadium construction, silicon pu Stadium, Shaanxi satellite sports provided by sports facilities Ltd. Shaanxi satellite. Shaanxi satellite sports facilities Limited (www.sxwxty.com) (www.sxwxty.com) strong, credible, in Xi'an plastic flooring industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shaanxi satellite sports and you work into the brilliant, for a better future! |
Admin>>>
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility