Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
- home > Supply > Xi'an silicon PU stadium construction cost, the cost of silicon PU Stadium, Shaanxi satellite sports
Xi'an silicon PU stadium construction cost, the cost of silicon PU Stadium, Shaanxi satellite sports
Information Name: | Xi'an silicon PU stadium construction cost, the cost of silicon PU Stadium, Shaanxi satellite sports |
Published: | 2015-06-06 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Silicon PU basketball court: three spraying points, first, two plus 30% (TB-205 weight) special sand, every TB-205 the amount of about 0.12kg, the third without sand (amount of about 0.06kg), when the sand should be first A component with a special sand mix well, then add component B Stir Yan'an silicon PU stadium construction cost, plus dilution water; three seconds of the area should be done three sand and a not sand (of four). B, tennis court: three spraying points, the first increase of 50% sand, the second with 20% sand, and the third channel without sand. C, badminton, volleyball: no sand spraying three. 4, crossed the buffer layer of silicon PU stadium construction 1) in the construction of the base coat check before confirmation process meet the construction requirements, material must be according to the ratio prior to construction within the amount of water added to the material, every barrel of material (25kg ) must be added to 250 g of water and mix well with an electric mixer (about three minutes) before use. When available water cup my company were weighed Tongchuan silicon PU stadium construction cost, the water has been added material must be used within one hour; is on the day spent materials as much as possible. 2) buffer layer construction is thin coating many times using the method of construction, both to ensure quality but also to save material. Construction with toothed trowel scraping the buffer layer material to the base surface, scraping every 2mm thickness can not exceed the cost of Hanzhong silicon PU stadium, each time interval before scraping together dryness subject (usually about 10 hours ), depending on the scene weather conditions until the desired thickness of coating scraped. Scraping attention leveling effect, if not leveling scraping teeth marks, add special thinner consistency adjusted to ensure that the surface Xi'an silicon PU stadium construction cost, the cost of silicon PU Stadium, Shaanxi satellite sports provided by sports facilities Ltd. Shaanxi satellite. Shaanxi satellite sports facilities Limited (www.sxwxty.com) (www.sxwxty.com) strong, credible, in Xi'an plastic flooring industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shaanxi satellite sports and you work into the brilliant, for a better future! |
Admin>>>
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility