Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
Information Name: | Hanzhong plastic runway | Shaanxi satellite sports (Online) | plastic runway |
Published: | 2015-06-21 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Classification of the construction process of a plastic track editor, garbage removal within the site, the basis for the manner described above to detect and make a record, clean water, plastic runway, dry with a hair dryer to blow the dust within the site; the ingredients, stirred site cleared, keeping the site clean and gum ingredients around. Plastic runway construction 2, with a wire brush to mud within the site, lime point brushing; 3, with a hammer, can not afford to brush Qianzai lime, cement and convex portions disposed of, then sweep the entire site 4, take a small amount of glue, Dali plastic runway, proportionately configured, a small test field. After the experiment, the experimental results the next process. 5, base back, the water part of the leveling material, the density of the place with a rubber seal failure. 6, the pavers need to be adjusted according to the scale, and then spreading construction throughout the thickness should meet the design requirements; 7, to be grassroots Puwan sclerosis, Xianyang plastic track, turn on the water looking for water points, the water at the press above Process leveling, to the end of plastic without water. After the primer is completely hardened, with a grinding machine on its surface polished to meet the requirements of flat, non-slip surface and then spit. 8, according to the drawings and design requirements, various lines marked in the venue location; plastic runway price estimate 1, mixed plastic track generally cost about 160 / sq m 2, cement base cost 120 yuan (asphalt base to be expensive about 200 or so), the thickness of the concrete foundation C20 15 cm, followed by the foundation of the original soil compaction - thirty-seven dust 20 cm - 15 cm layer of gravel stable -C20 concrete; asphalt concrete foundation 7-10 cm AC-8, AC-10 asphalt aggregate basis were the original soil compaction - thirty-seven dust 20 cm - 15 cm layer of inorganic material stability - asphalt concrete. Hanzhong plastic runway | Shaanxi satellite sports (Online) | plastic runway provided by the satellite sports facilities Ltd. Shaanxi. Shaanxi satellite sports facilities Limited (www.sxwxty.com) (www.sxwxty.com) is Xi'an, plastic floor leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer demand. Shaanxi satellite sports leadership with the staff warmly welcome all inquiries negotiations to create Shaanxi satellite sports a better future. |
Admin>>>
You are the 26114 visitor
Copyright ©2025 GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright ©2025 GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility