Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
- home > Supply > Plastic runway construction _ Shaanxi Xi'an satellite sports (certified) _ plastic track
Information Name: | Plastic runway construction _ Shaanxi Xi'an satellite sports (certified) _ plastic track |
Published: | 2015-07-01 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Plastic runway anti Studs largest force in the most frequently used starting point of one hundred meters of plastic track, it will not be spikes or starting frame damage. Impact resistance, non-toxic, odorless and easy to clean plastic laying ground, comfortable, attractive and durable, with a tough elastic layer and buffer layer, can absorb strong impact, the surface will not be damaged. Xi'an plastic runway safety of the use of safer, longer, easier to clean, easy maintenance, saving management costs. Color special elastic EPDM and PU granules, soft colors Xi'an plastic track surface thickness, granular surface, preventing reflection glare light, durable and beautiful, and multi-color, and hydrogen sulfide polymerization process does not produce harmful substances Xi'an plastic track cost and meet environmental requirements. Construction requirements for plastic runway plastic runway construction in asphalt or concrete foundation, basic practices and road construction about the same. Higher base surface flatness requirements to ensure consistency plastic surface layer thickness, elasticity even on the basis of quality requirements are as follows: 1 slope: horizontal <1% (curve 8 ‰, straight 5 ‰, semicircular area 5 ‰) in Xi'an plastic runway maintenance, longitudinal <1 ‰, high jump area <0.4%, the surface should be flat, smooth, smooth drainage. 2. Flatness: Flatness pass rate above 95%, three meters straightedge error 3mm. 3, positioning: the exact construction and draw lines, need for strong distinctive markers mark the four semi-tangent points and two runway center site. 4. Drainage: drainage system is necessary in two hours after the rain water discharge. In the frozen area, between the asphalt layer and add a layer of gravel layer is preferably a cloth buffer layer. Drainage trench along the foundation should do special water treatment. 5, the strength and stability: the foundation should have a certain strength and stability, even a solid surface, no cracks, no bad side seams straight and smooth. Cushion compaction, density of greater than 95%, after the medium-sized rolling machine pressure, no significant wheel tracks, loose topsoil, waves and other phenomena. Plastic runway construction _ Shaanxi Xi'an satellite sports (certified) _ plastic runway provided by the satellite sports facilities Ltd. Shaanxi. Shaanxi satellite sports facilities Limited (www.sxwxty.com) (www.sxwxty.com) is Xi'an, plastic floor leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer demand. Shaanxi satellite sports leadership with the staff warmly welcome all inquiries negotiations to create Shaanxi satellite sports a better future. |
Admin>>>
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility