Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
Information Name: | Plastic track, Shaanxi satellite sports, Tongchuan plastic track |
Published: | 2015-07-17 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Plastic runway - surface plastic pavement pavement step process includes a staple item, the bottom layer of the plastic surface processing, batching, feeding, feeding, paving, trimming, sprinkle granules. (1), nailing strips with primer laying step process. (2) treated with ethyl acetate primer surface. (3) Ingredients steps: recipe B component, measured as the ratio of the catalyst, stir, arranged gums. (4), feeding, feeding, paving, trimming paving process with primer. Plastic runway - the process of laying the plastic surface quality control 1, the establishment of quality management leadership team, project manager for the leader, the development of quality control measures. Quality management with both hands, one implementation of total quality management, the second is the implementation of ISO9001 quality system standards, quality will be held regularly, identify problems in time, Lintong plastic track, in order to promote and improve the quality of management. 2, the implementation of technicians, quality inspector quality and accountability, Jiangyoufalie. Respect and support the work of supervising engineers, and submit to supervision and timely implementation of the correct views of supervising engineers. 3, in the construction, adhere to the site of the test system, the development of the "construction technology plastic runway project" and "the performance of the construction site inspection records," in strict accordance with the plastic A and B were compounded ratio of construction, Yan'an plastic runway, found unqualified mixes immediately discarded. 4, in strict accordance with the requirements of the design documents and construction specifications for construction. 5, site construction, plastic runway, professional and technical personnel supervision, inspection, sampling inspection. Each process has a quality inspector to do every day to conduct random checks of different processes, there is a problem solved in time, Tongchuan plastic runway, and take notes. To the person in charge of its economic interests and linked to strict quality control, started working face should always POST flatness, thickness, slope, and record and fill in log construction. 6, the plastic thickness varying degrees by a thick wooden bar to ensure the grassroots low-lying area of ??grievance in the detection of the plastic grass slope> 10%, ± 1cm the region make a mark, and then leveling, and finally to ensure construction plastic surface flatness and slope to meet the requirements. Plastic track, Shaanxi satellite sports, Tongchuan in Shaanxi plastic track satellite sports facilities provided by the Company. Plastic track, Shaanxi satellite sports, Tongchuan in Shaanxi plastic track satellite sports facilities Limited (www.sxwxty.com) (www.sxwxty.com) this year introduced a new upgrade, the above picture is for reference only, please call this page or image on the telephone, to obtain the latest information, contact: Liu Bin. |
Admin>>>
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility