Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13711289

- Product Categories
- Friendly Links
- home > Supply > Plastic runway _ _ Yulin, Shaanxi satellite sports plastic track construction process
Information Name: | Plastic runway _ _ Yulin, Shaanxi satellite sports plastic track construction process |
Published: | 2015-07-18 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Breathable plastic runway Process Description Features: 1, to meet international standards. Mechanical pavement, spraying machinery, plastic runway, excellent flatness, no threshing phenomenon. 2, there is porosity, water permeable, breathable, excellent flexibility, no blistering. 3, all-weather use, Yulin plastic runway construction process, wear resistance, weather resistance, compression resistance, resistance to impact resistance, durable. 4, the price of the economy. Construction steps: 1, site cleaning, concrete coated base oil, asphalt surface Scraping 2, the mechanical laying of 11mm thick bottom, Baoji plastic runway project customization, one-component adhesive + rubber particles 3, mechanical spraying the surface layer 1.5mm thick, a single set parts adhesive + EPDM granules, and then spray it again in the opposite direction. 4, track measurement, stakeout and identification line. 5, site cleaning and exit. Plastic runway IAAF Track and Field Facilities design size standard manual required standard sports pole perimeter 400 meters, where the bend radius should be 36.5 meters, straight to avoid the blinding effect of low sun position along the north-south direction. The curve should be eight runway, Yan'an breathable plastic track construction and maintenance, each runway is 1.22 meters wide, has 10 straight runway. The inside of the runway safety area of ??not less than one meter, at best 1 meter outer security zone, starting area at least 3 meters, at least 17 meters sprint buffer segment. Shall not exceed the maximum inclination of the runway about 1: 1000, a downward gradient in the direction of running shall not exceed 1: 1000. Plastic runway _ _ Yulin, Shaanxi satellite sports plastic track construction process provided by the satellite sports facilities Ltd. Shaanxi. Plastic runway satellite sports _ _ Shaanxi Yulin in Shaanxi plastic track construction process satellite sports facilities Limited (www.sxwxty.com) (www.sxwxty.com) this year introduced a new upgrade, the above picture is for reference only, please dial this page Phone or pictures on obtain the latest information, contact: Liu Bin. |
Admin>>>
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26114 visitor
Copyright © GuangDong ICP No. 10089450, Shaanxi satellite sports facilities Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility